- 
                                                                Comprehensive Insulation Solutions
 Scope of Work:
 Tasks
 Managed the entire lifecycle of insulation services including procurement, fabrication, supply, delivery, installation, and handover.Coverage Area
 Equipment and piping in BMP Mechanical works, specifically Area 6 (Units 005, 056, 061, 079, 094, 907) and Areas 4 & 5.Types
 Both HOT and COLD insulation and cladding.Compliance
 All work was performed according to BMP Project approved drawings, specifications, standards, procedures, and safety & quality requirements, adhering to project schedules.
- 
                                                                Key Highlights:
 Complete Insulation Solution
 Provided end-to-end insulation services ensuring thermal efficiency and protection.Detailed Compliance
 Followed project-approved specifications to meet all quality and safety standards.
- 
                                                                Scope of Work: 
                                                                Tasks
 Supplied, hired, erected, and dismantled scaffolding for BMP Mechanical works in Area 6 (Units 005, 056, 061, 079, 094, 907).Materials Used
 Tubes & Fittings and Cuplock systems 2500 Tons + high quality materials mobilized to BMP.Types of Scaffolding: Tower / Independent / Birdcage Scaffolding
 Mobile Scaffolding
 Suspended / Cantilever / Bridge Scaffolding
 Special Desing whereas required
- 
                                                                Key Highlights: 
 Versatile Solutions
 Provided various scaffolding types to meet different access and support needs.Safety & Efficiency
 Ensured all scaffolding services were executed with high safety standards and efficiency.
- 
                                                                Scope of Work
 Tasks: Installation of refractory materials including Ceramic Fibre, Brick, and Casting for furnaces.
 Compliance: Work was performed as per BMP Project specifications, standards, procedures, and safety & quality requirements.
- 
                                                                Key Highlights: 
 High-Quality Refractory:
 Applied advanced refractory materials to ensure durability and performance in high-temperature environments.Adherence to Standards:
 Met all project-specific requirements and industry standards.
- 
                                                                Scope of Work
 Tasks: Painting of concrete foundations of tanks & internal tank painting in Tank farm area
 Compliance: Performed in accordance with BMP Project specifications, standards, procedures, and safety & quality requirements.
- 
                                                                Key Highlights: 
 Durable Finishes:
 Applied coatings to ensure protection and aesthetics of surfaceDetailed Adherence:
 Followed all project guidelines to ensure high-quality and long-lasting results.
- 
                                                                Scope of Work
 Tasks: Installation of fireproofing with lightweight concrete coating for steel structures.
 Compliance: Conducted as per BMP Project specifications, standards, procedures, and safety & quality requirements.
- 
                                                                Key Highlights: 
 Effective Fire Protection:
 Applied fireproofing solutions to enhance safety and compliance with fire protection regulations.Precision Application:
 Ensured all fireproofing work met the project’s detailed specifications and standards.
 
                         
                                 
                             
                             
                             
                            