-
Comprehensive Insulation Solutions
Scope of Work:
Tasks
Managed the entire lifecycle of insulation services including procurement, fabrication, supply, delivery, installation, and handover.Coverage Area
Equipment and piping in BMP Mechanical works, specifically Area 6 (Units 005, 056, 061, 079, 094, 907) and Areas 4 & 5.Types
Both HOT and COLD insulation and cladding.Compliance
All work was performed according to BMP Project approved drawings, specifications, standards, procedures, and safety & quality requirements, adhering to project schedules. -
Key Highlights:
Complete Insulation Solution
Provided end-to-end insulation services ensuring thermal efficiency and protection.Detailed Compliance
Followed project-approved specifications to meet all quality and safety standards.
-
Scope of Work:
Tasks
Supplied, hired, erected, and dismantled scaffolding for BMP Mechanical works in Area 6 (Units 005, 056, 061, 079, 094, 907).Materials Used
Tubes & Fittings and Cuplock systems 2500 Tons + high quality materials mobilized to BMP.Types of Scaffolding: Tower / Independent / Birdcage Scaffolding
Mobile Scaffolding
Suspended / Cantilever / Bridge Scaffolding
Special Desing whereas required -
Key Highlights:
Versatile Solutions
Provided various scaffolding types to meet different access and support needs.Safety & Efficiency
Ensured all scaffolding services were executed with high safety standards and efficiency.
-
Scope of Work
Tasks: Installation of refractory materials including Ceramic Fibre, Brick, and Casting for furnaces.
Compliance: Work was performed as per BMP Project specifications, standards, procedures, and safety & quality requirements. -
Key Highlights:
High-Quality Refractory:
Applied advanced refractory materials to ensure durability and performance in high-temperature environments.Adherence to Standards:
Met all project-specific requirements and industry standards.
-
Scope of Work
Tasks: Painting of concrete foundations of tanks & internal tank painting in Tank farm area
Compliance: Performed in accordance with BMP Project specifications, standards, procedures, and safety & quality requirements. -
Key Highlights:
Durable Finishes:
Applied coatings to ensure protection and aesthetics of surfaceDetailed Adherence:
Followed all project guidelines to ensure high-quality and long-lasting results.
-
Scope of Work
Tasks: Installation of fireproofing with lightweight concrete coating for steel structures.
Compliance: Conducted as per BMP Project specifications, standards, procedures, and safety & quality requirements. -
Key Highlights:
Effective Fire Protection:
Applied fireproofing solutions to enhance safety and compliance with fire protection regulations.Precision Application:
Ensured all fireproofing work met the project’s detailed specifications and standards.