PROJECTS

ALDUR POWER PLANT

AL DUR II SWRO DESALINATION PLANT

Duration: July 2019 to February 2022

Services Provided

  • Scope of Work:
    Managed the full spectrum of scaffolding services including supply, hire, erection, and dismantling to support the AL DUR II SWRO Desalination Plant project. Our scaffolding solutions facilitated safe and efficient access across the site, adapting to diverse construction and maintenance needs.
    Materials Used:
    Utilized high-quality Tubes & Fittings and Cuplock materials to ensure the robustness and reliability of the scaffolding structures.
  • Types of Scaffolding Provided:
    Tower / Independent / Birdcage Scaffolding:
    For stable, secure access to elevated or complex work areas.
    Mobile Scaffolding:
    Provided flexibility and ease of mobility for dynamic work environments.
    Suspended / Cantilever / Bridge Scaffolding:
    Tailored solutions for challenging site conditions, enabling safe and effective working platforms.
  • Key Highlights:
    Precision Installation:
    Safety & Compliance:
    Adhered to stringent safety regulations and quality standards to ensure the protection of workers and site integrity.
    Efficient Execution:
    Timely and effective scaffolding services that aligned with project schedules and minimized operational downtime.
  • Scope of Work:
    Applied specialized internal coatings to nine tanks as part of the AL DUR II SWRO Desalination Plant project. This service included surface preparation, application of protective coatings, and quality checks to ensure the longevity and performance of the tanks.
  • Key Highlights:
    Durable Protection
    Used advanced coating materials to provide long-lasting protection against corrosion and wear, enhancing the durability and efficiency of the tanks.
    Expert Application
    Conducted meticulous surface preparation and coating application to meet project specifications and industry standards.
    Quality Assurance
    Implemented rigorous quality control measures to ensure the coatings met all safety and performance requirements.